Viking · Hull No. 82-210 · 2026

Hooray

A Viking 82 Convertible built in June 2025 and delivered that year on twin MTUs, a 36-knot cruiser with a 42-knot top end. Documented as Hooray out of Dallas, Texas.

Build sheetViking · Hull No. 82-210 · 2026

Designer
Viking (in-house design, naval architecture and interior)
Original power
Twin MTU diesels
Construction
GRP hull, deck and superstructure

Her story, name by name

  1. 2025 – present

    HoorayCurrent

    Confirmed · USCG documented-vessel file, 2025-09 to 2026-09, ON 1358893, boatinternational.com

  2. 2025

    Delivery

    Delivered in 2025. 25.27 m overall, 6.53 m beam, 1.75 m draft, 111 GT; twin MTU diesels, 36 knots cruise, 42 knots top.

    Reported · boatinternational.com

  3. June 2025

    Build

    Built by Viking; HIN VKY82210F526 (built June 2025, model year 2026).

    Reported · USCG documented-vessel file, 2026-09, ON 1358893

Not yet on record: tournament record and photographs.